Before the AF took over a missile site, Site had to have many test run. Here is one test our crew
ran. Their was no missile in silo, Umbilical pluged in to box to simulate missile.
test 1: Verify disable with base, Turn keys - nothing happened. ( disable sent by base to site,
site send verification back to base)
test 2: Contractor unhooked antenna, Base verify loss of disable.
test 3: turn keys- nothing happened. enable timer prevented launch.
test 4: take 5 min. break. Turn keys- launch starts, all systems worked,got all the proper lights
with Door opened and lift off light. Test complete.
To over ride this system. set timer to 0:00 and unplug antenna. and away we go. It may
not have been that simple I don't know
Having studied the blue prints (part of the job) I believe I could have started a launch with a
jumper between two test points on the back of the launch sequense cabne. They put a lock
on that door.
In early 1970s they put in a 6 tumbler box on the MCCC console. I do not know how this
was wired into the launch sequense cabnet.